Construction Engineering Design Contract (1)

Enter into the contract:

Construction unit: hereinafter referred to as Party A;

Design unit: hereinafter referred to as Party B.

In order to clarify responsibilities, work together and work together to complete the design tasks of the national construction project, according to the provisions of the Regulations on Construction Engineering Survey and Design Contracts and the approved plan and task book, this contract is signed by the two parties for full compliance.

Article 1 Project name, scale, investment amount, construction site

Party A entrusts Party B to undertake the design project of the project. The construction and installation area is square meters, and the approved total investment is 10,000 yuan. The construction site is at.

Article 2 Obligations of Party A

1. Party A shall submit to Party B the design task book, project site selection report, raw materials (or approved resource reports), fuel, water, electricity, transportation and other aspects of the agreement documents and energy before the date of the year. Survey materials that meet the preliminary design requirements and technical materials that need to be obtained through scientific research. Party A shall provide approved preliminary design documents and survey data that meet the design requirements of the construction drawings, construction conditions, and technical information about the equipment before the construction of the construction drawings on the day of the month.

Party A must guarantee the quality of the above information and must not change it at will.

2. Promptly handle the approval of design documents at each design stage.

3. Before the commencement of the project, Party A shall organize the relevant construction unit, and Party B shall carry out the design and technical disclosure; after the completion of the project, Party A shall notify Party B to participate in the completion acceptance.

4. When the designer enters the construction site to carry out the work, Party A shall provide the necessary working conditions and be convenient in life. During the design and construction process, the test shall be carried out due to technical special needs, all expenses required and coordination with Party A. Party A is responsible for travel expenses to other places.

5. Party A must maintain Party B's design documents and may not modify them without authorization. Party A shall not copy, reuse or expand the scope of construction without the consent of Party B. Party A is obliged to protect the design copyright of Party B and may not transfer it to a third party for reuse.

Article 3 Obligations of Party B

1. Party B must deliver the preliminary design documents to Party A before the date of the year; deliver the technical design documents to Party A before the date of the year; and deliver the construction drawing design documents to Party A before the date of the year. Among them, the preliminary design documents are in one copy, the technical design documents are in one copy, and the construction drawing design documents are in one copy. Party A also needs to add the number of documents and the model fee, and the fee will be charged separately. Before the date of the year, Party B must submit all design documents (including budgetary documents, materials and equipment list) to Party A.

(In large-scale construction and installation projects, both parties can design in stages according to specific conditions. When design conditions are met, the two parties sign a phase design contract, specifying the name and date of the design information submitted by Party A at each stage, and the date on which Party B delivers the design documents. As an annex to this contract, please refer to Annex (2).)

2. Party B must submit the survey technical requirements and design according to the approved design task book or the approval document of the previous stage design, as well as the design technical and economic agreement documents, design standards, technical specifications, procedures, quotas, etc., and submit the quality-compliant design documents.

3. After the preliminary design has been reviewed by the higher authorities, Party B shall be responsible for the necessary modifications within the scope of the original mission statement.

4. The design unit shall cooperate with the construction project to undertake the design task, carry out the technical pre-construction technical disclosure, solve the relevant design problems in the construction, be responsible for design change and revision budget, participate in concealed project acceptance and project completion acceptance.

Article 4 Modification and suspension of design

1. Party A shall request the modification of the design of the project for any reason. With the consent of Party B, Party A shall, in addition to the delivery time of the design documents, Party A shall, according to the actual rework date of Party B, renew the design fee per working day, or in the design phase. The percentage of work rework is calculated.

2. If the original task book is reworked or modified, if it has major changes, it must have the opinion of the design approval authority or the design task approval authority. The payment of the design cost that has already been carried out is calculated according to the preceding article.

3. If Party A requests to stop design in the middle of the reason, Party B shall promptly notify Party B in writing that the design fee has not been refunded, and the design fee shall be increased and paid according to the actual time of work at this stage, and the contractual relationship shall be terminated.

Article 5 Quantity and delivery method of design fees

Within days after the design contract becomes effective, Party A shall deliver a deposit equal to 20% of the design fee to Party B. After the design contract is fulfilled, the deposit shall be used as the design fee; Party B shall submit Party B to Party B within one day after submitting the preliminary design plan. Paying the design fee of %; Party B shall settle all design fees to Party B within the day after Party A submits the construction drawing documents (a large-scale project with a long design period, the design fee for the construction drawing stage, which can be completed according to the individual project design. After the separate payment).

Article 6 Responsibility and breach of contract liability

1. Within the reasonable project investment control number, because Party B uses advanced technology or reasonable advice to save engineering investment, it can withdraw __% from Party B to save the investment amount.

2. Since Party A cannot provide relevant design information on time and accurately, Party B cannot design or cause design rework. In addition to the date of delivery of the design document, Party B shall also be calculated by Party A according to the actual loss of working days of Party B. Increase the design fee.

3. Party A shall not pay the deposit and design fee to Party B in accordance with the time stipulated in the contract, and shall pay Party B the liquidated damages according to the bank's provisions on deferred payment.

4. Due to the reason of Party B, delay in the delivery of the design documents, Party B shall pay Party A a penalty of the equivalent of the design fee (the Party A may deduct the design fee) for each delay.

5. Due to the poor quality of the design of Party B, it is necessary for Party B to continue to improve the design tasks, and to reduce the amount of waste caused by the loss or the design fee. For those who have caused major quality accidents due to design errors of Party B, Party B shall not only pay the design fee for the loss part, but also pay compensation equal to the design fee directly affected by the loss.

Article 7 Other

                                                                             .

This contract is effective after the signature of both parties on the day of the month, and all design tasks are invalid. If there are any unfinished matters in this contract, it is necessary to make additional provisions through mutual consultation. The Supplemental Agreement shall have the same effect as this Contract, but shall not be inconsistent with the contents of this Contract.

In the event of a dispute arising from the execution of the contract, both parties shall promptly resolve the dispute. If the two parties belong to the same department when the negotiation fails, the mediation by the superior competent department; if the mediation fails or does not belong to the same department, it may apply to the contract management authority prescribed by the state for arbitration, or directly to the people's court.

The original of this contract is in duplicate, and each party shall hold one copy; one copy of the contract shall be paid in one copy to each of the units, including the Commission, Construction Committee, and CCB.

Construction unit (Party A): Design unit (Party B):

Representative: Representative:

Contact: Contact:

Unit Address: Unit Address:

Postal Code: Postal Code:

Phone: Phone:

Fax: Fax:

Bank of deposit: Bank of deposit:

Bank account number: Bank account number:

Year, month and day

Attached:

(1) Design project fee schedule;

(2) Supplementary agreement for engineering design.

 ××× design project fee schedule

Annex 1

Project No. Project Name Unit Square Meter Design Content Unit Cost (RMB/m2) Project Volume Square Meter Investment Estimate (yuan) Design Fee Rate (%) Design Fee (yuan)

 The project entrusts the design of a total of square meters of investment estimate total yuan, and estimates the total design fee. When signing the contract, Party A shall pay Party B a design fee of 50% and temporarily pay the amount according to the yuan.

Note: The investment estimate is proposed by Party A. The designed investment amount is subject to the approved preliminary design estimate or revised design estimate.

Construction unit: (stamped) Design unit: (stamped)

Infrastructure Leader: Infrastructure Leader:

Signing a fee agreement

Annex 2

×××Engineering Design Supplementary Agreement

This agreement is signed under the No. Architectural Design Contract and is an attachment to the original contract.

The design needs to be prepared and the parties agree:

1. Party A shall submit the following basic documents for construction documents on time:

No. Document and data name Delivery date (or period)

2. Party B shall deliver the following design documents on time on the premise that Party A submits the above documents and materials on time:

No. Design file name and content Delivery date

Construction unit: (stamped) Design unit: (seal)

Infrastructure Leader: Design Office Director:

Signing a fee agreement: Year Month Day

点赞(0) 打赏

评论列表 共有 0 条评论

暂无评论

热门产品

劳务公司运营资料:人力农民工县分公司运营资料|劳务公司运营资料,劳务,公司,运营,资料,人力,农民工,分公司
劳务公司运营资料:人力农民工县分公司运营资料
高职单招合作协议书|高职单招合作协议,高职单招合作协议书,高职合作协议,单招合作协议,高职单招合作合同,高职,单招,合作,协议书
高职单招合作协议书
门窗建材销售技巧和话术 48招|门窗建材销售技巧,门窗建材销售话术,建材销售技巧,建材销售话术,门窗,建材,销售,技巧,话术 48招
门窗建材销售技巧和话术 48招
美容院销售技巧|美容院销售技巧,美容院,销售,技巧
美容院销售技巧
贷款话术以及顾客常见问题|贷款话术,贷款问答话术,贷款问题话术,贷款,话术,以及,顾客,常见问题
贷款话术以及顾客常见问题
聊天话术技巧:不会和客户聊天,教你10个高效沟通技巧!|聊天话术技巧,聊天话术,高效沟通技巧,高效沟通话术,聊天,话术,技巧,不会,客户,教你10个,高效,沟通
聊天话术技巧:不会和客户聊天,教你10个高效沟通技巧!
要成功,学话术!美容师话术参考大全|美容师话术,美容师话术大全,美业话术,美业话术资料,美业话术大全,美业话术手册,成功,学话,美容师,话术,参考,大全
要成功,学话术!美容师话术参考大全
72页寿险陌拜行销+23页车险陌拜话术|寿险陌拜行销,车险陌拜话术,寿险话术,车险话术,寿险销售技巧,车险销售技巧,寿险陌拜技巧,车险陌拜技巧,72页,寿险,陌拜,行销,+23页,车险,陌拜话术
72页寿险陌拜行销+23页车险陌拜话术

历史上的今天:05月02日

团队合作;做艺术家

团队合作科研不是一个人能独立完成的事情。尤其在当前的环境下,大团队、跨学科合作是发展的必然趋势。这就要求我们不能只注重提升自己,而置团队于不顾。在日常的科研中,在推进工作完成的同时,也需要注意维护人际关系、营造团结共进的氛围。很幸运的是,在至今我工作过的课题组都有着这样良好的风气。而这种风气的维持和强化需要每个人的投入。即便在刚开始科研的时候,自己在专业水平上有所不足,但也并不妨碍在需要的时候站出

团队高效沟通的秘密,全在这3点!

众所周知,沟通在一个团队中,起到非常重要的作用。即使所有人都意识到沟通的重要性,但是由于每个人的沟通的能力和技巧不同,在信息传达过程里或多或少会出现词不达意的情况。有人会说,是不是团队氛围好了,沟通起来也就方便了?不如先来回想自己和父母沟通的过程吧,有的家庭氛围其乐融融,即便相互之间熟悉至此,但是你还是有很多事情,很难和父母沟通。同理,不是一个团队氛围好了,沟通协作的效率就一定能提高。偶尔,一个熟

在线教育APP开发的价值

在线教育APP开发的价值随着现代社会移动互联网的快速发展,教育产业迎来了新的发展机遇——在线教育。对许多教育企业来说,这相当于打开了一扇新世界的大门,但实现在线教育的前提是必须开发自己的在线教育应用程序。北京木奇移动技术有限公司,专业的软件开发公司,欢迎交流合作。下面我们讲一下在线教育APP开发的价值在哪里?希望对大家有所帮助。1.提供个性化教育传统的教育方式只能在学校或与教师面对面进行,如果开发

【脚本】抖音直播带货方案直播脚本(范本)

【脚本】抖音直播带货方案直播脚本(范本)抖音直播带货方案(范本)一、直播主题:爆款一折购二、直播时间:20xx年7月25日(周三)13:00三、直播地点:XXX商业区四、主持人:小E五、嘉宾:XXX六、直播细节1、前期准备在开播前主播提前准备,找个明亮隔音的房间,打扮自我形象,并检查设备,准备开播,开播前项目人员提前准备好项目信息说辞(简明扼要),在开播前项目人员提前进入主播间,2、开场预热首先进

【话术】做好家电销售-你一定要学会这些销售技巧和话术

【话术】做好家电销售-你一定要学会这些销售技巧和话术做好家电销售,你一定要学会这些销售技巧和话术家电销售技巧和话术一:亚洲是全世界家电销售增长最快的地区,而中国,即是规模宏大的生产制造基地,又是蕴藏着巨大潜力的消费市场,在这种双重角色下,中国家电销售正在上演着中国传奇。家电销售额增长迅速,有三个因素构成了市场增长的驱动力,推动着各大家电的更新换代。首先,随着生活水平的提高,消费者希望选择容积更大的

网站建设需要哪些步骤如何轻松快速搭建网站

网站建设需要哪些步骤如何轻松快速搭建网站网站一般我们都有两种方式来建站,前面一种就是就定制建站,从设计到前端到程序,根据自己的想法和需求独立开发,这种一般适合要求比较高的用户群体,优点是用户体验相当好,但缺点是开发周期长,开发费用高,开发费用在五六千到2万不等,具体根据实际的用户需求情况来定。那么显然上面这种方式不太适合很多刚开始想做网站的朋友们,那大多数我们都会选择模板建站,市面上也有很多CMS

热门专题

昆明综合高中|昆明综合高中
昆明综合高中
安徽中源管业有限公司|安徽中源管业有限公司,安徽中源管业有限公司介绍,安徽中源管业有限公司电话,安徽中源管业有限公司地址,安徽中源管业有限公司厂家,安徽中源管业有限公司电力管,安徽中源管业有限公司管材
安徽中源管业有限公司
综合高中|云南综合高中,昆明综合高中,综合高中能考本一吗,综合高中和普通高中的区别,综合高中是什么意思,综合高中能参加全国统一高考吗,综合高中可以考哪些大学,综合高中的学籍是什么
综合高中
安徽开放大学|安徽开放大学报名,安徽开放大学报考,安徽开放大学,什么是安徽开放大学,安徽开放大学学历,安徽开放大学学费,安徽开放大学报名条件,安徽开放大学报名时间,安徽开放大学学历,安徽开放大学专业
安徽开放大学
自考本科|自考本科有用吗,自考文凭,自考本科文凭,自考文凭有用吗,自考本科文凭有用吗,自考文凭承认吗
自考本科
大理科技管理学校|大理科技管理中等职业技术学校,大理市科技管理中等职业技术学校
大理科技管理学校
云南巨榕教育投资集团有限公司|云南巨榕教育投资集团有限公司,巨榕教育集团,巨榕教育
云南巨榕教育投资集团有限公司
国家开放大学|国家开放大学报名,国家开放大学报考,国家开放大学,什么是国家开放大学,国家开放大学学历,国家开放大学学费,国家开放大学报名条件,国家开放大学报名时间,国家开放大学学历,国家开放大学专业
国家开放大学

微信小程序

微信扫一扫体验

立即
投稿

微信公众账号

微信扫一扫加关注

发表
评论
返回
顶部