Construction and installation engineering subcontract

General contractor (Party A):

Address: Postal Code Telephone

Legal representative: position

Subcontractor (Party B):

Address: Postal Code Telephone

Legal representative: position

In accordance with the "Contract Law of the People's Republic of China", the "Measures for the Implementation of the General Subcontracting of Construction and Installation Projects" of the Ministry of Construction and the relevant provisions of the XX Document of the People's Government of the XX Municipality, this contract was signed by both parties and was strictly implemented.

Article 1 Project

First, the project name:

Second, the project location:

Third, the project number: Construction license number: _ business license number:

4. Subcontracted project scope and engineering volume (with budget)

V. The term of the subcontracted project starts on the day of the month and is completed on the day of the month.

6. Labor costs of subcontracted projects.

7. Party B enters the types of work and the number of people.

Article 2 Project settlement

According to the subcontracted project, the first month's advance living expenses will be calculated according to the number of contractors, and will be deducted at the next month's settlement. The project will be pre-contracted according to the acceptance of the project completed during the construction period (the extent must not exceed the completed amount). 80%) After the project is completed, it will be checked and accepted by both parties.

Article 3 Project Quality

Party A shall carry out technical disclosure and organization acceptance according to the national quality acceptance specifications and assessment standards. Party B shall carefully organize the construction according to the requirements of the construction drawings and specifications to ensure the quality of the project. If the quality is not up to standard, it must be reworked and repaired, and the loss of materials and materials shall be borne by Party B. If the quality of the project is inferior and cannot be saved, Party B shall be responsible for compensating for the loss of all materials.

Article 4 Safety Production

1. Party A shall make a safe disclosure of the project undertaken by Party B, put forward clear safety requirements, and conduct supervision and inspection. Party B must conscientiously implement the rules and regulations concerning safety construction, strictly abide by the safe operation procedures, and provide safe production facilities to Party A. Party B can only use it after passing the inspection. If there is any casualty accident during the construction due to violation of the above regulations, Party B shall be responsible for the loss.

2. Labor protection articles and live operating devices used by individuals, such as insulating gloves and rubber boots, shall be resolved by Party B. If Party B does have difficulties, it may propose a plan for use and Party A shall assist in the settlement.

3. In the course of construction, Party B shall be responsible for the fire accident caused by Party B's violation of fire regulations and regulations.

Article 5 Life Management

1. After Party B's workers enter the scene, the accommodation and food problems will be provided by Party A and the main cooking utensils (cauldrons, cages, hair dryers, large panels) shall be kept by Party B. If there is damage, the compensation will be compensated. The small scattered appliances are provided by Party B, and the domestic coal is provided by Party A in a quantitative amount.

2. The food and oil used for daily life shall be provided by Party B. Party A shall provide convenience in medical and health care. If Party B's workers have illness, they may seek medical treatment from Party A with the approval of their responsible person. The medical expenses shall be paid by Party B. Responsible for paying monthly.

Article 6 Unit price of subcontracted labor costs

1. Subcontracting of unit projects, each budgeted working day is yuan. The implementation of unilateral square meters of labor costs, per square meter.

Second, the internal plastering and subcontracting, to achieve high quality every working day of the yuan. The eligible cost per working day is RMB. A separate labor cost is applied for each square meter.

3. Each budgeted workday for a single sub-container and earthwork is yuan.

4. Every day of work is cleared.

5. All-day shutdowns, materials waiting, water cuts, power cuts, and clearing work days are yuan.

6. Water, electricity, heating, and sanitation projects, each budgeted workday (subcontracted by building number).

7. During the winter construction period (from December 1 to the end of February), the working day will be reduced by 10%. The unit price for the workday is yuan.

Eight, subcontracted project cost schedule (one to seven items can be listed)

Article 7 Material Supply Management

Party B shall set up a special person to handle the limit collection procedures for cement, steel, commodity components, hardware, linoleum, asphalt and special materials for water, electricity, heating and sanitation. Party B shall strictly follow the quality requirements and materials provided by Party A for construction. Party B shall bear the waste of materials used in the construction of Party B and the unreasonable excess of the quota. Party B shall use the materials according to the 垛 (heap) during the construction, so that the daily use will be cleared, the materials will be cleaned, and the site will be kept clean.

Article 8 Construction Machinery

First, the large-scale tools are the responsibility of Party A to ensure the use of the need.

Second, the manual operation tool is responsible for Party B.

3. Party B shall take care of the equipment that Party A is responsible for, and Party B shall be responsible for compensation if there is any loss.

4. The medium and small-sized machinery required for construction shall be equipped by Party A according to the construction plan. One machine shall be equipped with a driver to ensure the normal construction of Party B. Party B shall not allow unauthorized operation of the equipment (with its own machinery in accordance with relevant regulations).

Article 9 Site Management

1. Personnel of Party A and Party B shall strictly abide by the various management systems on the site and organize the construction under the unified leadership of Party A's on-site personnel. The two parties involved in the plan, schedule, and material supply shall cooperate closely to ensure smooth construction.

2. Party B shall educate construction personnel on compliance with laws and regulations, safety production and property protection, and designate special personnel to be responsible for on-site security work. It is strictly forbidden to steal on-site materials. If there is any illegal behavior in violation of the on-site management system, Party A has the right to take necessary Party B shall bear legal responsibility and be responsible for compensation for economic losses.

Third, the subcontractors should be relatively stable. Work signs should be worn at the construction site. Persons outside the contract are not allowed to enter and leave the site.

Article 10 Liability for breach of contract

1. Projects subcontracted by Party B shall not be subcontracted. In the course of construction, the inspection fails to meet the national acceptance specifications, and the quality of the project cannot be guaranteed. Party A has the right to terminate the contract and cause losses of rework, and Party B shall compensate.

2. After the contract is signed, neither party may arbitrarily change or cancel it without the consent of both parties. If Party B fails to cancel the contract unilaterally without Party A's consent, Party B shall compensate Party A for the economic losses caused by Party A's impact on the construction plan; if Party A cancels the contract midway, it shall compensate Party B for the economic losses caused thereby.

3. Party B must complete the construction period and quality requirements as stipulated in the contract. Otherwise, each time overdue, Party A shall reimburse Party A for overdue liquidated damages of _7% of the labor cost of the subcontracted project.

4. Party A and Party B shall not owe all kinds of payables for any reason, such as defaulting on non-payment, and repaying the default payment of overdue payment according to the bank's short-term loan interest rate.

Article 11 Supplementary Provisions

1. In the event of a dispute in this contract, both parties shall consult in time and the negotiation will not be completed. If it cannot be solved, it can be solved according to the following item (): (1) Applying for arbitration to the Economic Contract Arbitration Committee of the building where it is located, and (2) Prosecuting to the People's Court.

2. In the first instance of this contract, both parties shall hold one copy. The remaining copies are submitted for filing.

3. If it is required for forensic (notarization), it may go to the district or county administration for industry and commerce at the location where the building is located for notarization or notarization.

4. Other terms agreed by the parties:

1.

2.

Article 12 Contract attachments and validity period

First, the contract annex:

                                                                                           

1. Project budget book;

2.

2. This contract shall become effective from the date of the seal of both parties, and shall expire after the completion of the project and settlement.

Total package unit: ________________________

Legal representative: ______________________

       year month day

Subcontracting unit: ________________________

Legal representative: ______________________

       year month day

点赞(0) 打赏

评论列表 共有 0 条评论

暂无评论

热门产品

高职单招合作协议书|高职单招合作协议,高职单招合作协议书,高职合作协议,单招合作协议,高职单招合作合同,高职,单招,合作,协议书
高职单招合作协议书
第三方非代收货款货物运输合同模板|货物运输合同,货物运输合同模板,第三方,代收,货款,货物运输,合同,模板
第三方非代收货款货物运输合同模板
XXXXO2O平台协议书|O2O平台协议书,O2O平台协议,xxxxo2o,平台,协议书
XXXXO2O平台协议书
《电子商务运营合作协议合同》|电子商务运营协议,电子商务运营合同,合作协议合同,电子商务,运营,合作,协议,合同
《电子商务运营合作协议合同》
签证服务协议|签证服务协议,签证服务,协议
签证服务协议
劳务中介服务合同|劳务中介服务合同,中介服务合同,劳务服务合同,劳务,中介服务,合同
劳务中介服务合同
境外劳务派遣和雇用合同|境外劳务派遣,境外劳务雇佣,境外劳务派遣合同,境外劳务雇佣合同,境外,劳务派遣,雇用,合同
境外劳务派遣和雇用合同
国外劳务合同|国外劳务合同,劳务合同,国外,劳务合同
国外劳务合同

历史上的今天:04月29日

2023年三位一体:自荐信(个人陈述)的撰写(附3篇自荐信)

2023年三位一体:自荐信(个人陈述)的撰写(附3篇自荐信)(一)个人陈述写作要求个人陈述(自荐信)的字数要求按照每个高校的不同标准,一般为800~1000字。通常以电子文档形式上传至相关申请网站,也有高校要求考生将个人陈述手写并邮寄。在格式上,自荐信与信件的要求一致。内容上,自荐信以让面试官感觉“此考生各项能力符合本高校本专业的要求且表现较为突出”为中心展开。具体内容一般包含两个方面

如何写好一份三位一体个人陈述(自荐信)?写作细节曝光!附范文

如何写好一份三位一体个人陈述(自荐信)?写作细节曝光!附范文2021年浙江省三位一体报名通道已经开启,大家在准备三位一体报考材料的过程中,可能会遇到有些高校会要求提交一份个人陈述的问题。由于之前没有过多涉及过这方面的写作,比较困扰到底什么样的个人陈述能够更加打动考官,本文将为大家奉上一份三位一体个人陈述写作干货,手把手教大家避坑扫雷,顺利通过初审。个人陈述写得好的重要性个人陈述,也可以理解为一份书

【三位一体】自荐信写作技巧、范文推荐

【三位一体】自荐信写作技巧、范文推荐本 期 导 读自荐信作为三位一体考试的“第一关”,起着至关重要的作用。自荐信的好坏直接关系到考生的初审情况。如何让你的才能、潜力在有限的空间里发挥出夺人的光彩,在瞬间吸引住高校招生老师的眼光,不见其人,先见其文,是给面试考官最直白的第一印象,这封自荐信极其关键。2023年浙江省属三位一体,共有9所学校需要个人陈述,也叫自荐信,都需要手写。其中浙江工业大学的还在初

三位一体的个人陈述/自荐信怎么写(附范文)

三位一体的个人陈述/自荐信怎么写(附范文)三位一体的报名,一部分学校要求学生亲笔书写1000字左右的个人陈述(自荐信),如浙工大、杭电、浙师大等,那么个人陈述(自荐信)如何写?壹路升学来谈几点,供大家参考!一封优秀而又真诚的个人陈述,可以在一定的程度上可以提高考生初审的通过概率。个人陈述需要展示自己的特色、自己的优势。考生要尽量自己写,这样才能有血有肉。请别人给你写的往往很空洞,评审老师看不出你的

三位一体个人陈述/自荐信书写指南!内附范文!

三位一体个人陈述/自荐信书写指南!内附范文!如果你打算参加“三一”那个人陈述书是必需的!为了让各位顺利通关小编今天讲讲个人陈述书怎样写个人陈述书的作用:1、在院校报名初审阶段,若个人陈述优秀则在相同条件下初审入围的几率将大大增加。2、在三位一体综合测试(面试)中,考官往往会就个人陈述相关问题进行进一步追问,若个人陈述优秀将会对最终的面试成绩产生巨大影响。个人陈述书就是对自我的介绍,内容包括成长经历

热门专题

天麻的功效与作用吃法|天麻的功效与作用,天麻的功效与作用吃法,天麻炖什么治头痛最好,天麻的功效与作用禁忌,天麻多少钱一斤,天麻的功效与作用吃法及禁忌,天麻怎么吃效果最好,天麻粉的功效与作用,天麻怎么吃
天麻的功效与作用吃法
APP开发|app开发_app开发公司_app软件开发_专业app开发_云南app开发公司_app定制_原生app开发定制
APP开发
国家开放大学|国家开放大学报名,国家开放大学报考,国家开放大学,什么是国家开放大学,国家开放大学学历,国家开放大学学费,国家开放大学报名条件,国家开放大学报名时间,国家开放大学学历,国家开放大学专业
国家开放大学
安徽开放大学|安徽开放大学报名,安徽开放大学报考,安徽开放大学,什么是安徽开放大学,安徽开放大学学历,安徽开放大学学费,安徽开放大学报名条件,安徽开放大学报名时间,安徽开放大学学历,安徽开放大学专业
安徽开放大学
金诺幼儿园(春城路金诺幼儿园)|昆明官渡区幼儿园,幼儿园报名,官渡区幼儿园,春城路幼儿园,幼儿园招生,学前班,昆明幼儿园,金诺幼儿园,环城南路幼儿园,石井路幼儿园
金诺幼儿园(春城路金诺幼儿园)
外贸网站建设|外贸网站建设,英文网站制作,英文网站设计,美国主机空间,外贸建站平台,多语言网站制作
外贸网站建设
易捷尔高职单招|易捷尔高职单招,易捷尔高职单招培训,单招分数线,单招录取分数线,高职单招学校分数线
易捷尔高职单招
一年制中专|中专学历,中专是什么学历,中专是什么,中专有什么专业,中专升大专,一年制中专
一年制中专

微信小程序

微信扫一扫体验

立即
投稿

微信公众账号

微信扫一扫加关注

发表
评论
返回
顶部